GNS Brinkman installs 63 roller shutters at Beverwijk Bazaar

GNS Brinkman has delivered the reconstruction of HAL 30 of the Beverwijk Bazaar. Commissioned by the contractor, 63 ZS91 steel roller shutters and 6 Facade transparent roller shutters were produced and installed at breakneck speed.

Because of the perfect partnership and alignment with the VIOS Construction Company from Utrecht, impressive and rapid has been delivered.

The smooth partnership has immediately resulted in a follow-up assignment where GNS Brinkman is also providing significant transparency and therefore visibility for the Corridore.

DSC01961  DSC01974